-> Reinforcing Design
-> Industrial prefabrication
-> Provision of qualified personnel (foreman, worksite supervisor, team leader, analysist, draughtsman, etc.)
-> Achievement of reinforcing drawings
-> Worksite supervision
-> Installation of shaping and prefabrication plant
-> Template design
-> … |
REFERENCES
1)
Achievement of reinforcement execution drawings
• Montgenèvre Hopper (complete project)
• RES Cadarache reactor project
• M51 Building, Ile Longue, Brest (complete project)
• Bridge over the "Rivière des Pluies", Reunion islands
• "Viaduc des 3 Bassins", Reunion islands
• LNG tanker landing pier at Fos Cavaou (complete project)
• Munitions depot, Toulon (complete project)
• Dubai Metro Viaduct
• Cycofos Project
2)
Technical assistance for the development of reinforced concrete achievement methods
• Participation in the RES Methods cell, Cadarache
• Achievement of methods with equipment provided for various works on the London LGV line
• Participation in feasibility studies for raft foundation reinforcing steel for the EPR Reactor
• Achievement of refinery methods, South Africa
• Design and installation of templates and methods for the achievement of joists on the Dubai Metro Viaduct
3)
Technical assistance provided by management staff
• Goro Nickel Plant, New Caledonia
• Dubai Metro Viaduct |