High-speed train line South Europe Atlantic - Tours-Bordeaux section (France)
Client: Cosea
The reinforcement of the structures on our sites of the LGV SEA south section are fixed on an on-going basis, below the track-base of the structure PRA 2418 section 13
Feed-water pipe, EDF hydro-electric power station (Nentilla, France)
Client : Spie Batignolles
We have undertaken the reinforcement for 5 solid concrete supports for the feed-water pipe at the EDF hydro-electric power station, Nentilla (Aude). The total tonnage was in the region of 150 tons. 3 of this solid supports are very special due to the steep incline, on which they are constructed, obliging us to work on attached support line, to avoid falling. Our teams were given a special training in acrobatics to realise this project…
Water reservoirs lots 2 (Reunion island)
Client: GTOI
We start the project "Antenne 2" for the transfer of fresh water in La Reunion. We have to construct 4 reservoirs and pumping station within 6 months using approximately 250 tons of steel rebar.
The base-slab of the first circular reservoir will be concreted before the 15 december 2012.
The Rizzanese dam (Corsica)
Client : GTM/Razel-Bec
After several years of work, the Rizzanese dam in Corsica is being filled with water. We will recall the outstanding reinforced structures carried out for this sizeable project and particularly for the 3 toboggan slopes at the base of the overflow chutes, on the downstream face of the dam.
Jules Horowitz reactor - CEA (Cadarache, France)
Client: Razel-Bec
We are completing the reinforcement of the last layer of the RER pool which is the most technical and the most sensitive part of the reactor building. This part of the works reaches a ratio of 500kg/m3 of steel rebar. Anchorage plates and inserts must be incorporated demanding extremely tight tolerances. The quality of this work serves as an example in order to satisfy the safety requirements in nuclear construction.